£2m in lifetime savings for Menzies with a 471kW installation reducing grid dependence by over 30%.

A 471kW installation that reduced Menzies' dependence on the grid by over 30%, generating £2.1m in lifetime savings and a 3.7 year return on investment.
This installation generates 33% of the site's electricity needs on-site, reducing grid dependence and protecting against energy price volatility.